EV charging without broadband: 4G and Wi-Fi on every charger
Every Brim charger has 4G and Wi-Fi built in, so it is online the day it is powered. Our design pack tells you, plot by plot, which link each charger will use.

A plot has no broadband on the day the keys are handed over. The resident orders the line after moving in; the charger went on the wall before that. A remote post-mounted charger never gets a line at all.
That is why every Brim charger has 4G and Wi-Fi built in, and why our design pack tells you, plot by plot, which one each charger will use.
Why a new-build plot is offline on completion day
Coverage is not a connection. A line in the street is not a line live in the house, and on a new plot broadband is ordered after completion while the charger is commissioned before it.
4G and Wi-Fi on every charger
The Brim charger carries 4G, Wi-Fi and Ethernet as standard. It arrives pre-commissioned, the installer mounts it and connects the power, and it reports in over 4G as soon as it is live.
When the resident's broadband arrives, the charger pairs to the home Wi-Fi from the MyBrim app. Nothing is retrofitted, nothing is ordered per plot, and no plot waits on a line.

Which link each plot gets
Parking on a development does not always come with a router. When we design your site, the pack marks each plot with the link its charger will use, so you know before anything is ordered.
Private driveway
Runs on 4G from commissioning and moves to the home Wi-Fi once broadband is in. Nothing for the site team to do.Remote post-mounted parking
Power and nothing else. No router is coming, so the pack marks it 4G, and it has that link from day one.Communal car park
Not on any resident's Wi-Fi. The pack marks it 4G, or Ethernet where a wired link exists, with every session metered to the driver.
The communal car park is where the link matters most: on one shared supply, load management needs to know which cars are drawing, billing needs each session’s meter reading, and driver groups need to add or remove a resident without a visit.

What the regulations require offline and online
The Smart Charge Points Regulations 2021 treat charging and smart charging separately. Regulation 7 says a charger that loses its network must still be able to charge a car. Regulation 5 defines smart functionality as starting with the charger being able to send and receive information over a network.
| Function | Needs a connection |
|---|---|
| Charging a car | No |
| Syncing the off-peak schedule | Yes |
| Metering and billing | Yes |
| Remote support and firmware | Yes |
| Tariff changes | Yes |
What works from the moment the charger is powered
The MyBrim app pairs by QR in two minutes, so the resident sets cheap hours on completion day with no router in the house. The portal gives the managing agent live activity, tariffs and billing across every site, and 24/7 UK driver support takes the first call, not the site office. The 5-year warranty follows the plot to the homeowner.
We design the site and tell you what each plot needs
Send us the site layout and our engineers return charger positions plot by plot, ducting, site load, a cost per plot, and the link each charger will run on: Wi-Fi, 4G or Ethernet. Email plugmein@fulltothebrim.com, call +44 (0)20 7097 5911, or use the contact page.